HD Painting & Roofing LLC

Roofing

Roof Replacement in Oshkosh, WI

A roof is a system, not a layer of shingles. We tear off to the deck, fix what we find underneath, and rebuild it so water and air both go where they should.

Roof Replacement work by HD Painting & Roofing LLC

01We tear off. We don't lay over.

Shingling over an existing roof is faster and cheaper on the day, and it is why a lot of roofs in this part of Wisconsin fail early. A layover hides rotten decking, doubles the weight your rafters carry, and traps heat that cooks the new shingles from below. It also means nobody ever looked at your flashing.

Every replacement we do starts with a complete tear-off down to the wood. That is the only point at which anyone can honestly tell you what condition your roof is in, and you get to see it too. We photograph the bare deck before we cover it back up.

02What goes back on

Ice and water shield along the eaves and in every valley. In a climate that swings across freezing dozens of times a winter, ice dams are not a rare event here, they are an annual one. The membrane is what stops the water that backs up behind that ice from finding your ceiling.

Synthetic underlayment across the whole deck rather than felt. It does not tear when it gets wet, it does not wrinkle, and it keeps the house dry if weather moves in between tear-off and shingles.

GAF Timberline HDZ architectural shingles, the laminated kind rather than three-tab. LayerLock construction fuses the overlapping layers together. That widens the nail zone and makes a correct fastening more likely across a long run. Installed with four qualifying GAF accessories they can also carry the WindProven warranty, which has no maximum wind speed limit. The StainGuard Plus copper microsites earn their place in a climate this humid: they carry a 25-year limited warranty against the blue-green algae streaking you see on so many roofs here.

We bring physical shingle samples to every estimate. Color looks completely different on a board in your driveway than it does in a brochure, and whichever you pick gets written into the contract.

New flashing at every wall, chimney and pipe. Reused flashing is the most common source of a leak on an otherwise sound roof, and this trade reuses it a lot.

Balanced ventilation: intake at the soffit, exhaust at the ridge. Most of the prematurely aged roofs we tear off had exhaust and no intake, which does close to nothing.

03Decking is priced honestly

Nobody can see the condition of your decking through the shingles, so nobody can quote it accurately in advance. What we can do is tell you up front what a sheet costs, show you the bad wood when we find it, and replace only what needs replacing.

On the older homes here, that often means the sheathing around a chimney or the bottom two feet along an eave where an ice dam has been getting in for years. On plenty of roofs it means nothing at all.

04The site gets cleaned

Tear-off is a messy operation and the mess is almost entirely nails. We tarp the beds and shrubs before anything comes off, and we run a magnet over the lawn and the drive at the end of every day, not just at the end of the job. Every old shingle and all the debris is hauled away as part of the project.

The final magnetic sweep happens with you there. We do not consider the job complete until you have walked the property with us.

05What you're covered by

Two separate warranties, and it is worth knowing which is which. GAF warrants the materials. We warrant the work. A 3-year workmanship warranty covers the installation itself, so any installation defect found inside three years gets repaired at no cost to you. That warranty is tied to the property, so it transfers if you sell the house.

HD Painting & Roofing is a Registered Dwelling Contractor with the State of Wisconsin, carries $1,000,000 in general liability and full workers' compensation coverage, and we are happy to hand over the documentation before any work begins. If a contractor hesitates when you ask for that, it tells you something.

We also pull the permit. Oshkosh and most of the surrounding municipalities require a building permit for a roof replacement, and handling the application is part of your project rather than something left to you.

Step by step

How a replacement runs

  1. 01

    Free estimate

    We walk the roof, look in the attic if we can get to it, and give you a written number. There is no charge and no obligation.

  2. 02

    Tear-off

    Everything comes off down to the wood. Landscaping gets covered before we start.

  3. 03

    Deck inspection

    We check the decking, show you anything soft or rotten, and replace it before we go any further.

  4. 04

    Dry-in

    Ice and water shield at the eaves and valleys, synthetic underlayment over the whole deck, new drip edge.

  5. 05

    Flashing and shingles

    New flashing at every penetration, then shingles run from the eave up, with ridge vent and caps last.

  6. 06

    Clean-up and walkthrough

    Magnet over the whole property, then we walk it with you before we leave.

Our work

Roof Replacement we've done

Everything around the house gets covered before a single shingle comes off. Tear-off debris is mostly nails, and this is how the beds and the lawn stay out of it.
Everything around the house gets covered before a single shingle comes off. Tear-off debris is mostly nails, and this is how the beds and the lawn stay out of it.
Tear-off complete. Original plank decking exposed and inspected before anything new goes down.
Tear-off complete. Original plank decking exposed and inspected before anything new goes down.
New decking over the old planks, with the chimney flashing opened up ready to re-flash.
New decking over the old planks, with the chimney flashing opened up ready to re-flash.
Synthetic underlayment going on over the full deck.
Synthetic underlayment going on over the full deck.
GAF Timberline HD bundles loaded on the ridge and spread out so nothing sits on one rafter.
GAF Timberline HD bundles loaded on the ridge and spread out so nothing sits on one rafter.
Staged and ready to run courses.
Staged and ready to run courses.

Questions

Straight answers.

Anything not covered here, call Erik on (920) 500-8214. That’s the roofing line.

How long does a roof replacement take?
Most single-family homes in this area are one to two days. A steep or cut-up roof, or one that needs a lot of decking, can run to three.
Can you replace a roof in winter?
Yes, within limits. Shingles need enough warmth to seal down, so in deep cold we hand-seal the courses that need it. If the forecast makes a safe, watertight job impossible we will tell you and schedule it properly rather than start something we cannot finish.
Do I need to be home?
No. We do need access to the driveway for the dumpster and a working outdoor outlet. If you want to see the bare deck before we cover it, tell us and we will time it so you can.
How do I know if I need a replacement or just a repair?
Repairs make sense when the roof is otherwise sound and the problem is local: a section of flashing, a few wind-lifted shingles, one bad boot. Once you are seeing granule loss across whole slopes, curling at the edges, or leaks in more than one place, you are spending money on a roof that is finished. We will tell you which one you have.
Do I need a permit for a re-roof?
In most cases yes. Oshkosh and the surrounding municipalities require a building permit for a roof replacement. We handle the permit application as part of your project, so it is not something you have to chase.
What happens if you find rotted decking after tear-off starts?
We stop and call you before doing anything else. Decking is priced by the sheet and only added to your contract with your approval. We never add scope without asking first. It is also why decking cannot be quoted up front: nobody can see the wood through the shingles.
Do you work with my HOA?
Yes. If your neighborhood needs color or material approval, tell us at the estimate and we will get your selections submitted in time.
What happens to the old shingles?
Everything is hauled away as part of the project, and we run a full magnetic nail sweep of the yard before we call the job complete.

Free estimate

Need roof replacement?

Free estimates on every job, roofing or painting. Call either of us, or send the details and we'll get back to you.

Free estimates on every job. Prefer to talk? Call (920) 500-8214.